PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started the Footings layout at Elev.7- Stair -4,5 Facing North-West (800x600).jpg Started the Footings layout at Elev.7- Stair -4,5 Facing North-East (800x600).jpg Rebar mats for Elev. 1,2,3 shear walls 2nd floor Facing South (800x600).jpg Stripped foundation walls at Monumental Stairs Facing South (800x600).jpg Stripped Wall forms along L-M Facing South-East (800x600).jpg
Previous page Stripped Wall forms along L-M Facing South-East (800x600)
Stripped Wall forms along L-M Facing South-East (800x600)